The ASME code requires each fabricator that builds or repairs ASME code equipment to have a quality program in place. A written quality manual is required for the program, which…
A “Form U-1 Manufacturer’s Data Report” is like a birth certificate for a pressure vessel. It certifies who fabricated the vessel, the thickness and materials of most components, and the…
Did you know that Ward’s World-Class Engineering Group regularly works in-step with our Field Service Division to help our customers with re-rates on tanks, vessels, and heat exchangers? Often, our…
You may have heard the old joke that ASME stands for Always / Sometimes / Maybe / Except. Not true, but it is true that it can be hard to…
The ISM Manufacturing Index (PMI) in the United States dropped to 49.2 in April 2024 from 50.3 the previous month, significantly below market expectations. This decline indicated a contraction in…
Designing, manufacturing, installing and commissioning an ASME Pressure Vessel, API Tank or Shell & Tube Heat Exchanger can be an all-encompassing, time-consuming and expensive process. Due to those efforts and…