A “Form U-1 Manufacturer’s Data Report” is like a birth certificate for a pressure vessel. It certifies who fabricated the vessel, the thickness and materials of most components, and the…
In May, ISM Manufacturing Index (PMI) stood at 48.7 percent, a decrease of 0.5 percentage points from April’s 49.2 percent (i.e. a PMI reading above 50 means expansion, while below…
Did you know that Ward’s World-Class Engineering Group regularly works in-step with our Field Service Division to help our customers with re-rates on tanks, vessels, and heat exchangers? Often, our…
You may have heard the old joke that ASME stands for Always / Sometimes / Maybe / Except. Not true, but it is true that it can be hard to…
Designing, manufacturing, installing and commissioning an ASME Pressure Vessel, API Tank or Shell & Tube Heat Exchanger can be an all-encompassing, time-consuming and expensive process. Due to those efforts and…
In the ASME code, Appendix 2 gives the rules and formulas for design of custom flanges (in other words, flanges that are not standard Class 150, 300, etc). Although the…