The ASME code requires each fabricator that builds or repairs ASME code equipment to have a quality program in place. A written quality manual is required for the program, which…
Whether you need parts, filter cartridges, filters, pumps, changeouts, etc. we are here to provide any and all things water filtration! Are you needing new Stainless Steel Filters? Equipment Enterprises,…
A “Form U-1 Manufacturer’s Data Report” is like a birth certificate for a pressure vessel. It certifies who fabricated the vessel, the thickness and materials of most components, and the…
In May, ISM Manufacturing Index (PMI) stood at 48.7 percent, a decrease of 0.5 percentage points from April’s 49.2 percent (i.e. a PMI reading above 50 means expansion, while below…
Designing, manufacturing, installing and commissioning an ASME Pressure Vessel, API Tank or Shell & Tube Heat Exchanger can be an all-encompassing, time-consuming and expensive process. Due to those efforts and…
In the ASME code, Appendix 2 gives the rules and formulas for design of custom flanges (in other words, flanges that are not standard Class 150, 300, etc). Although the…