The ASME Section VIII pressure vessel code covers design and fabrication of new equipment. Once a vessel is installed and placed into service, it no longer governs. The American Petroleum…
Starting the New Year off strong, January’s ISM Manufacturing Index (PMI) registered a 58.7 mark, just under December’s 60.5. As a reminder, a reading in excess of 55 is considered exceptional. Of…
Last month, we continued our discussion about how some equipment just can’t be revived and referenced an actual ongoing project. The head had suffered from Stress Corrosion Cracking (SCC) under…
The ISM Manufacturing Index (PMI) increased to 60.7 in December, a measured increase from November’s 57.5 reading and extending the overall expansion in the economy to the 8th consecutive month. This was the fastest pace of…
Last month, we talked about how some equipment just can’t be revived. Recently, Ward was asked to help a good customer with a leaking half pipe on a pressure vessel…
Designing a pressure vessel to hold the required internal pressure is just a start. The designer must also account for all other expected loads on the vessel. One important design consideration…