Most Petrochemical and Refinery Facilities utilize embedded mechanical contractors to handle the day to day maintenance (and sometimes new construction) activities. While this is practical in many situations, often, the…
Brittle fracture at low temperatures can be a major problem with carbon steel and many alloys, if not properly considered in the design stage, and verified with testing. Steel is…
If pumps are the “heart” of your processing system, piping would be the veins and arteries that get your product from one piece of equipment to the next, ultimately transferring…
The Code assigns responsibilities to three different entities when it comes to pressure vessels. First is the fabricator, who has the main responsibility to ensure that all aspects of the…
Radiographic testing (radiography) is used to detect discontinuities such as porosity, cracks and inclusions in materials or welds. It is performed by placing film or a digital detector on one side of…
Pressure vessels, tanks, large specialty heat exchangers, and other similar equipment generally require large openings for personnel entry (for inspection, cleaning, maintenance, or repairs) or even for certain process additions.…