Vessel engineers first use the design pressure to find the required thickness of all components on a vessel. Next, normally a stock plate or pipe thickness is chosen for each…
The Code assigns responsibilities to three different entities when it comes to pressure vessels. First is the fabricator, who has the main responsibility to ensure that all aspects of the…
Radiographic testing (radiography) is used to detect discontinuities such as porosity, cracks and inclusions in materials or welds. It is performed by placing film or a digital detector on one side of…
Similar to eddy current testing, this test method uses an internal probe to inspect heat exchangertubes. But unlike eddy current, ultrasonic inspection is the basis of the method. The IRIS…
Ward’s 2D and 3D Drawing Capabilities Eliminate Mistakes Before They Happen. Engineers fabricating equipment for the CPI, Oil & Gas, and associated industries have depended on two dimensional drawings in…
March 2, 2021 – Process Heating Magazine Key Considerations for Tube-End Joint Design | Process Heating (process-heating.com) FIGURE 1 (Cover Photo). Manual welding of stainless-steel tube-ends enables better control…