Column Rebuild Ward was contracted to unstack a chemical processing column, build a new sump/skirt section, then re-stack the column. Our ability to handle this project turnkey allowed our customer…
Many requirements for welds in the ASME code depend on a weld’s category and its type, but those two classifications often get mixed up. So what are they, and what…
May’s ISM Manufacturing Index (PMI) increased marginally to 56.1 from April’s 55.4 mark. May’s data indicates the 24th consecutive month of economic expansion. Survey respondents continue to mention supply chain and pricing…
Condenser Re-Tube – A Virginia utility came to Ward with a challenging project to refurbish two large heat exchangers during an outage. There were options for doing them in parallel…
Vessel support design is one of the most important aspects of a safe pressure vessel design, but it can be easily overlooked since the ASME code does not include methods…
Declining for the second consecutive month, April’s ISM Manufacturing Index (PMI) slid to a 55.4 mark from the 57.1 registered in March. Headwinds presented by persistent labor shortages, instability in energy…